however it should now
be added
that after consultation with this De- partment, the
OW KI
with the most
commendable spirits had already in 1875 paised this floors at their
expense to record with the
dicats. So that
proposed futures quadients.
when the
works are
completed
the
no doors will be left below
The type of masonry along
the
por.
4.1, and the
general.
condition
hous coloured yellow in Drawing
1
of the wall after the
able
already desa
typhoon having been already
cribed, an outline specification of the proposed work of pestoration
briefly classified
MAY
be at
A J
follows :
(1) Resetting of
the
upper
where
: where damaged, and raising the exping level to the red live shewn in the Longitudinal Sec-
tion.
(1) Raking out and commits ponit-
ing of all joints along the face
of
the wall.
(11) Backing the wall with dydran-
he time concreter
as shown in
Prawings h° 25+ 25A.
(1) Raising the roadway to
respond with the altered levels of the coping course, concertingg
the se
surface, and paising
levels of
Resitting
the abu
abutting
the
streets.
asonry
and
raising Coping Course.
All the stones loosened pe
displaced
will